Wind Energy

It serves customers who want to produce their own energy with the help of wind turbines.

  • Preparation of Preliminary and Detailed Feasibility:
    Determining the capacity to be installed and preparing the preliminary feasibility within this scope, then determining the turbine to be installed as a result of the field studies and making detailed feasibility studies,
  • Preparation of Required Documents for Project Application:
    Gathering all necessary documents on behalf of the customer, including the Out of Scope of EIA document,
  • Making an Application to the Relevant Institution:
    Application to the distribution company in the region as per the legislation, to TEİAŞ if it is connected by transmission, or to the OIZ Directorate if it is in an OIZ with a distribution license,
  • Receiving Technical Interaction Analysis (TEA) Report:
    Applying to TÜBİTAK RAPSİM for Technical Interaction Analysis and obtaining the approved report
  • Receiving the Invitation Letter to the Connection Agreement:
    Receiving the Call Letter to the Connection Agreement after the preliminary and technical examinations of EDAŞ/TEİAŞ/OSB and the receipt of the TEA report,
  • Preparation of Financial Reports and Presentations for Banks:
    Preparation of financial reports and presentations for banks in order to provide project financing, participation in financing meetings with banks if necessary,
  • Preparation of TEDAŞ Electricity Project:
    Making the Generation Facility Electricity Project, submitting it to TEDAŞ, realizing the revision requests of TEDAŞ units, following the approval process with the company that made the project,
  • Making Connection Agreement with EDAŞ/TEİAŞ/OIZ:
    Signing the connection agreement with EDAŞ / TEİAŞ / OIZ after the approval of the electricity project by the relevant institutions and the preparation of other necessary documents,
  • Preparation of Tender Specifications for Installation, Management of Tender, Selection of Contractor:
    Preparing the tender files for determining the most suitable contractor company to install the WPP facility, managing the tender process, determining the winning company,
  • Supervision During Facility Establishment:
    Managing the start-up/installation process of the WPP facility, ensuring that the installation is carried out quickly and efficiently by being on site, preparing weekly reports, ensuring coordination between the contractor and the employer,
  • Provisional Acceptance and System Usage Agreement with EDAŞ/OSB:
    After the installation is completed, ensuring that the temporary acceptance is made by TEDAŞ teams, organization of the field trips of the acceptance committee and then signing the system usage agreement with EDAŞ / TEİAŞ / OIZ,
  • Making Insurance Agreements:
    Receiving proposals from companies and making agreements in order to ensure that the WPP facility is insured with optimum conditions in order to protect against possible damages that may occur in the future,
  • Making Maintenance/Repair Agreements:
    In order to ensure the smooth and correct operation of the WPP facility, receiving offers from the relevant companies for maintenance, repair and monitoring services, making agreements